Own projects

Inoni implements a project from a single art. If you are able to create a project at Adobe Ilustrator or Corel Draw, you can do the whole thing by using the ready template available on the pages of selected products. Take care of the design guidelines and the order will be completed as soon as possible!

The most important guidelines:

  • Logotypes should be in curves, or in PNG or high resolution tiff. As a few, we print in high resolution, which is why the quality of graphics provided by you matters to us.
  • If you use external logos of companies, we must have permission to use them.
  • Our logotype is located on every piece of clothing we produce. Of course, we do it so that it does not disturb the graphics.
  • When ordering various models of costumes in equal graphics, please prepare the pattern on only one model (template) of a given type of clothing. This means that you only prepare one t -shirt template, shorts, jackets, etc. Transferring the project to the other models selected by the client will deal with our graphics department, and all designs will be sent to your acceptance.

If you are unable to perform the project alone, or you would like us to make it for you, fees in accordance with the price list.

Price lists in force.

Production stages:

  • Preliminary determination of demand. This will help to design on target constructions
  • The design and acceptance of the client's final version of the project (mail with acceptance is a condition for the start of the further stage). Example of a project for approval.
  • Supplementing the list on our order template.

It is necessary to start production efficiently. It also allows you to verify the correctness of the order, set the date, delivery methods.

  • Prepayment 50 % of the value of the order (company) and 100 % of the order value (natural person). We can't change anything during production. The production lasts on average 5 weeks, but its process begins immediately after the assumption is adopted. Already then we prepare materials for sublimation, cut the constructions selected by the client. The production time depends on several factors, one of them is above all the time in which the order will be placed. At the peak of the season, this period is between 6 and 10 weeks.
  • We issue the final invoice before receiving the parcel. After regulating, you are happy with the best costumes in Poland.

It is possible to accelerate production, but this is associated with an additional fee + 30 % of the order value. Therefore, if you know that you are starting in a triathlon in July, it is good to deal with the production of the overalls a little earlier.